Ashaiman construction update

Ashaiman factory under construction

With the digester walls finished, the factory area in Ashaiman is beginning to take shape. The concrete structure forms 27 x 27m, while the entire factory area forms a large trapezoid by approximately 200 x 200m.

The area will host the digester, drying beds, waste water treatment, composting research area (i.e. for the Via Water project), a CHP (Combined Heat and Power) system and a knowledge center.

Back to News