Teshie toilet block finished

October 2011

The construction of the Teshie toilet block (20-seater) has been finished. Safi Sana Ghana Ltd signed a management contract with the local Jekora Ventures Ltd. In the first year Jekora and Safi Sana will test the Safi Sana management model and waste control. The local community will play an important role in assessing the success of this pilot. In the surrounding area of the block, including the beach side,  there is a grey water and solid waste pollution. Jekora Ventures, Safi Sana Ghana ltd and the local authorities (LeKMA) have joined forces to clean the area and develop a program to give the beach its original purpose, a recreative site for the local community.